NB

Nicolas Briand

VIE - Subcontract Administrator on North Field East LNG Expansion Project in Ras Laffan, Qatar

26 ans

Résumé

Young Graduate, French international volunteer (VIE) working on the North Field East (NFE) project.

"NFEXP is an expansion of North Field, the world’s biggest single non-associated natural gas field, offshore north-east Qatar peninsula."
https://www.offshore-technology.com/projects/north-field-expansion-project/

And we're building the onshore expansion, adding x4 mega liquefied natural gas (LNG) trains, that will increase Qatar's production capacity by 43% from 77 million tonnes per annum (Mtpa) to 110Mtpa.

I am in charge of different contracts: Heavy Haulage & Heavy Lift subcontract on EPC-1 (transportation and lifting of heavy equipment of utilities and offsite) + Warehouse Management activites + General Works.

Expériences professionnelles

Subcontract engineer

Technip Energies , Nanterre - CDI

De Septembre 2024 à Aujourd'hui

Expatrié au Qatar sur le projet NFE de Technip Energies (construction de l'usine de GNL pour le compte de Qatar Energy) - contrat EPCC -Engineering, Procurement, Construction et Commissioning- d'une dizaine de milliards de dollars US.

Je suis en charge de deux contrats de sous-traitance (transport lourd/levage lourd) + warehouse management, ces deux contrats nous permettent d'assurance le transport, le levage et le stockage des divers équipements du projet. Je participe également à la gestion de contrat de sous-traitance du scope principal de Technip Energies à savoir la construction et la mise en route des Utilités/Inlet/Slug Catchers/CO2 capture area /Prefabrication workshop (piping/concrete...)

- Suivi et réponses aux demandes de travaux additionnels
- Gestion des réclamations Cost et/ou Extension of Time depuis/vers les sous-traitants
- Suivi mensuel de la facturation et des paiements aux sous-traitants
- Réunions hebdomadaires avec les sous-traitants
- Préparation du rapport mensuel d’activité des marchés de travaux
- Préparation des avenants contractuels
- Suivi de la correspondance liée aux Marchés de Travaux
- Coordination avec les autres disciplines du Projet (Ingénierie, Achats, Construction,…)afin de s’assurer / anticiper que le
sous-traitant est en mesure d’exécuter ses prestations sans disruption et ainsi protéger les intérêts de l’entreprise
vis-à-vis face à de potentielles réclamations du sous-traitant
- Implication dans la vie du chantier : Visites de Site régulières ; participation aux visites HSE

Vie - subcontract administrator on north field east lng expansion project in ras laffan, qatar

Technip Energies , Nanterre - VIE

De Septembre 2022 à Aujourd'hui

Heavy Haulage and Heavy Lifting Subcontract Administrator:

Follow-up and responses to requests for additional work
Management of Cost and/or Extension of Time claims from/to subcontractors
Monthly monitoring of invoicing and payments to subcontractors
Weekly meetings with subcontractors

Preparation of the monthly works contract activity report
Preparation of contractual amendments
Follow-up of correspondence related to Works Contracts

Coordination with the other disciplines of the Project (Engineering, Procurement, Construction, etc.) in order to ensure / anticipate that the subcontractor is able to perform its services without disruption and thus protect the interests of the company vis-à-vis -to face potential complaints from the subcontractor
Involvement in the life of the construction site: Regular Site visits; participation in HSE visits

Ingénieur projet - project management officer

SETEC EOCEN - CDI

De Septembre 2021 à Août 2022

On mission for Airbus UpNext - ZeroEmission:

Support the engineer team by providing support in project management, planning ... with the aim of making a demonstrator fly (hydrogen) in 2025/2026.

https://www.linkedin.com/posts/airbus_the-zeroe-demonstrator-has-arrived-activity-6901898461562617856-rpP3?utm_source=share&utm_medium=member_desktop

Risk management engineer intern

SETEC EOCEN - Stage - alternance

De Mars 2021 à Août 2022

Management of a European financing contract in aeronautics
Project Management AIRBUS Clean Sky 2 Program - AIRBUS Research & Technology Program

Optimization of risk management:
Based on the existing procedure, the objective is to optimize risk management for improve the identification and quantification of impacts.

Activities:
- Make a status of the current methodology, hard points and constraints
- Define a new approach to identify and quantify risks
- Develop a method to harmonize the process
- Test the new approach on a given scope
- Establish a dashboard consolidating all the risks and impacts

In relation with the Project Management Institute Book of Knowledge

https://www.clean-aviation.eu/

Formation complémentaire

Échange universitaire - S7

Colorado Mesa University - Mechanical Engineering - Energy Industry

2020 à 2021

ISEP Study Abroad, international exchange student, semestre 7

Département Mechanical Engineering, Colorado Mesa University de Grand Junction, Colorado:

- Energy Industry Fundamentals
- Land Management Fundamentals
- Small and Business Entrepreneurship
- Elementary Astronomy
- International Studies

Associations

Association des Élèves Ingénieurs de Cherbourg

Trésorier

Parcours officiels

CHERBOURG-OCTEVILLE – Niveau I – Ingénieur en Génie des Systèmes industriels – 2021

Langues

Anglais - Courant

Espagnol - Notions

Compétences

Subcontract Administration
QHSE
oil and gas
internationnal
Gestion de projet
Gestion de projet, Analyse des risques
Gestion de contrat de construction
EPC

Centres d'intérêt

  • Oil & Gas
  • industrie de l'énergie
  • aviation
  • business
  • sciences politiques et internationales